Vacating is one of the most sensitive stages of redevelopment because members surrender possession of their existing homes and become dependent on contractual protections.
Advance PMC believes societies should complete a structured readiness review before the final member vacates.
Important agreements, rent arrangements, approvals, guarantees, member records and possession documentation should be checked before the society hands over control of the property.
Once the building is vacated, correcting missing safeguards may become more difficult. Advance PMC helps societies ensure that protection is in place before physical possession changes hands.
Practical Checklist
Verify executed Development Agreement.
Verify member PAAAs.
Check rent and deposit arrangements.
Confirm applicable bank guarantees.
Record existing member entitlements.
Verify required approvals.
Prepare building handover records.
Photograph existing common assets.
Record keys, meters and documents handed over.
Obtain formal acknowledgement of possession.

Leave a Reply