Advance PMC: Why Material Substitutions During Construction Must Be Documented

Written by

in

During a long construction project, developers or contractors may occasionally propose changing materials because of availability, cost or technical reasons.

Advance PMC believes significant material substitutions should be properly evaluated against the agreed specification before being accepted.

A replacement product may appear similar but differ in durability, performance, warranty or long-term maintenance requirements.

Changes may sometimes be justified, but they should never become invisible. Advance PMC helps societies maintain transparency between the material originally promised and the material eventually installed.

Practical Checklist

Record the original specified material.

Document the proposed substitute.

Compare technical specifications.

Compare warranty terms.

Check performance and durability.

Obtain consultant recommendation.

Record reasons for substitution.

Obtain required written approval.

Maintain the approved substitution record.