Advance PMC: Why Societies Should Record Every Approved Design Deviation During Construction

Written by

in

Construction projects sometimes require changes after work begins because of site conditions, approvals or technical requirements. However, those changes should remain transparent to the society.

Advance PMC believes every significant design deviation should be recorded along with the reason, technical recommendation and approval supporting the change.

Without a proper record, future committees may struggle to understand why the completed building differs from earlier drawings.

Advance PMC helps societies maintain continuity between approved design intent and actual construction.

Practical Checklist

Record original design requirement.

Describe the proposed deviation.

Document the reason for change.

Obtain consultant recommendation.

Check member impact.

Record approval authority.

Update relevant drawings.

Maintain final deviation register.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *