Advance PMC: Why Societies Should Verify Project Progress Against Approved Drawings

Written by

in

A building may appear to be progressing quickly, but visible construction alone does not confirm that work is being executed according to approved plans.

Advance PMC believes site progress should periodically be compared with relevant approved drawings, specifications and agreed project requirements.

This can help identify deviations before they become embedded into later stages of construction.

Progress should be measured by more than the number of completed floors. Advance PMC helps societies connect physical construction with approved design and documented obligations.

Practical Site Verification Checklist

Keep the latest approved plans available during inspection.

Compare structural layout with approved drawings.

Check member-flat configurations.

Verify common-area layouts.

Review parking configuration.

Check shafts and service areas.

Record material deviations with photographs.

Obtain clarification before allowing significant deviations to continue.