Building layouts often evolve during approvals and detailed planning. Small design changes can affect member flats, common areas, parking, amenities or building services.
Advance PMC believes every important design revision should be documented and compared with previously approved drawings and commitments.
Without proper tracking, members may discover changes only when construction is advanced and corrective options are limited.
Design development is normal, but undocumented change creates risk. Advance PMC helps societies maintain transparency between the design originally approved and the building ultimately delivered.
Practical Design-Change Checklist
Maintain copies of every approved drawing revision.
Give each drawing a revision number and date.
Compare member-flat layouts before approving changes.
Verify carpet-area impact.
Check changes to parking and common areas.
Record changes to amenities and building services.
Obtain written approval for material deviations.