Advance PMC: Why Member Flat Specifications Should Be Verified Before Finishing Work Begins

Written by

in

Many important member-flat specifications are easier to correct before finishing work is substantially completed. Once flooring, plumbing, electrical work and fixtures are installed, changes can become expensive and disruptive.

Advance PMC believes societies should verify important flat specifications during construction rather than waiting until the final possession inspection.

Layouts, electrical points, plumbing provisions, doors, windows and agreed finishes should be compared with the approved specifications at the appropriate stage.

Quality control works best when issues are detected early. Advance PMC helps societies verify member commitments while corrective action is still practical.

Practical Checklist

Verify flat layout.

Confirm carpet-area configuration.

Check electrical-point locations.

Review plumbing provisions.

Check door and window specifications.

Verify flooring and finish requirements.

Record deviations photographically.

Obtain rectification before final finishing