Advance PMC: Why Societies Should Verify Terrace and Podium Waterproofing Before Final Finishes

Written by

in

Terraces and podium areas are highly exposed to rainwater and weather conditions. Waterproofing failures in these locations can later affect ceilings, parking areas, structural elements and common spaces.

Advance PMC believes waterproofing should be inspected and tested before tiles, landscaping or other finishing layers make the underlying work difficult to access.

Finding a defect during construction allows the developer to rectify it before handover. Discovering the same problem after possession may involve repeated repairs and disruption.

Advance PMC helps societies verify hidden protection before visible finishing creates an impression that the work is complete.

Practical Checklist

Verify waterproofing system used.

Inspect surface preparation.

Record application photographs.

Check slopes and drainage points.

Conduct applicable ponding tests.

Record test results.

Rectify leakage before covering.

Maintain inspection records.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *